SB 5241 - Fusion energy facilities

Source

Section 1

The legislature finds that the present and predicted growth in energy demands in the state of Washington requires a procedure for the selection and use of sites for energy facilities and the identification of a state position with respect to each proposed site. The legislature recognizes that the selection of sites will have a significant impact upon the welfare of the population, the location and growth of industry and the use of the natural resources of the state.

It is the policy of the state of Washington to reduce dependence on fossil fuels by recognizing the need for clean energy in order to strengthen the state's economy, meet the state's greenhouse gas reduction obligations, and mitigate the significant near-term and long-term impacts from climate change while conducting a public process that is transparent and inclusive to all with particular attention to overburdened communities.

The legislature finds that the in-state manufacture of industrial products that enable a clean energy economy is critical to advancing the state's objectives in providing affordable electricity, promoting renewable energy, strengthening the state's economy, and reducing greenhouse gas emissions. Therefore, the legislature intends to provide the council with additional authority regarding the siting of clean energy product manufacturing facilities.

It is the policy of the state of Washington to recognize the pressing need for increased energy facilities, and to ensure through available and reasonable methods that the location and operation of all energy facilities and certain clean energy product manufacturing facilities will produce minimal adverse effects on the environment, ecology of the land and its wildlife, and the ecology of state waters and their aquatic life.

It is the intent to seek courses of action that will balance the increasing demands for energy facility location and operation in conjunction with the broad interests of the public. In addition, it is the intent of the legislature to streamline application review for energy facilities to meet the state's energy goals and to authorize applications for review of certain clean energy product manufacturing facilities to be considered under the provisions of this chapter.

Such action will be based on these premises:

  1. To assure Washington state citizens that, where applicable, operational safeguards are at least as stringent as the criteria established by the federal government and are technically sufficient for their welfare and protection.

  2. To preserve and protect the quality of the environment; to enhance the public's opportunity to enjoy the esthetic and recreational benefits of the air, water and land resources; to promote air cleanliness; to pursue beneficial changes in the environment; and to promote environmental justice for overburdened communities.

  3. To encourage the development and integration of clean energy sources.

  4. To provide abundant clean energy at reasonable cost.

  5. To avoid costs of complete site restoration and demolition of improvements and infrastructure at unfinished fission nuclear energy sites, and to use unfinished fission nuclear energy facilities for public uses, including economic development, under the regulatory and management control of local governments and port districts.

  6. To avoid costly duplication in the siting process and ensure that decisions are made timely and without unnecessary delay while also encouraging meaningful public comment and participation in energy facility decisions.

Section 2

The definitions in this section apply throughout this chapter unless the context clearly requires otherwise.

Section 3

  1. [Empty]

    1. The provisions of this chapter apply to the construction of energy facilities which includes the new construction of energy facilities and the reconstruction or enlargement of existing energy facilities where the net increase in physical capacity or dimensions resulting from such reconstruction or enlargement meets or exceeds those capacities or dimensions set forth in RCW 80.50.020 (14) and (29). No construction or reconstruction of such energy facilities may be undertaken, except as otherwise provided in this chapter, without first obtaining certification in the manner provided in this chapter.

    2. If applicants proposing the following types of facilities choose to receive certification under this chapter, the provisions of this chapter apply to the construction, reconstruction, or enlargement of these new or existing facilities:

      1. Facilities that produce refined biofuel, but which are not capable of producing 25,000 barrels or more per day;

      2. Alternative energy resource facilities;

      3. Electrical transmission facilities: (A) Of a nominal voltage of at least 115,000 volts; and (B) located in more than one jurisdiction that has promulgated land use plans or zoning ordinances;

      4. Clean energy product manufacturing facilities;

    3. Storage facilities; and

    1. Fusion energy facilities. However, such a fusion energy facility receiving site certification must also secure required licenses and registrations, or equivalent authorizations, for radiation control purposes from designated state or federal agencies.

    2. All of the council's powers with regard to energy facilities apply to all of the facilities in (b) of this subsection and these facilities are subject to all provisions of this chapter that apply to an energy facility.

  2. [Empty]

    1. The provisions of this chapter must apply to:

      1. The construction, reconstruction, or enlargement of new or existing electrical transmission facilities: (A) Of a nominal voltage of at least 500,000 volts alternating current or at least 300,000 volts direct current; (B) located in more than one county; and (C) located in the Washington service area of more than one retail electric utility; and

      2. The construction, reconstruction, or modification of electrical transmission facilities when the facilities are located in a national interest electric transmission corridor as specified in RCW 80.50.045.

    2. For the purposes of this subsection, "modification" means a significant change to an electrical transmission facility and does not include the following: (i) Minor improvements such as the replacement of existing transmission line facilities or supporting structures with equivalent facilities or structures; (ii) the relocation of existing electrical transmission line facilities; (iii) the conversion of existing overhead lines to underground; or (iv) the placing of new or additional conductors, supporting structures, insulators, or their accessories on or replacement of supporting structures already built.

  3. The provisions of this chapter shall not apply to normal maintenance and repairs which do not increase the capacity or dimensions beyond those set forth in RCW 80.50.020 (14) and (29).

  4. Applications for certification of energy facilities made prior to July 15, 1977, shall continue to be governed by the applicable provisions of law in effect on the day immediately preceding July 15, 1977, with the exceptions of RCW 80.50.071 which shall apply to such prior applications and to site certifications prospectively from July 15, 1977.

  5. Applications for certification shall be upon forms prescribed by the council and shall be supported by such information and technical studies as the council may require.

  6. Upon receipt of an application for certification under this chapter, the chair of the council shall notify:

    1. The appropriate county legislative authority or authorities where the proposed facility is located;

    2. The appropriate city legislative authority or authorities where the proposed facility is located;

    3. The department of archaeology and historic preservation; and

    4. The appropriate federally recognized tribal governments that may be affected by the proposed facility.

  7. The council must work with local governments where a project is proposed to be sited in order to provide for meaningful participation and input during siting review and compliance monitoring.

  8. The council must consult with all federally recognized tribes that possess resources, rights, or interests reserved or protected by federal treaty, statute, or executive order in the area where an energy facility is proposed to be located to provide early and meaningful participation and input during siting review and compliance monitoring. The chair and designated staff must offer to conduct government-to-government consultation to address issues of concern raised by such a tribe. The goal of the consultation process is to identify tribal resources or rights potentially affected by the proposed energy facility and to seek ways to avoid, minimize, or mitigate any adverse effects on tribal resources or rights. The chair must provide regular updates on the consultation to the council throughout the application review process. The report from the council to the governor required in RCW 80.50.100 must include a summary of the government-to-government consultation process that complies with RCW 42.56.300, including the issues and proposed resolutions.

  9. The department of archaeology and historic preservation shall coordinate with the affected federally recognized tribes and the applicant in order to assess potential effects to tribal cultural resources, archaeological sites, and sacred sites.

Section 4

  1. This section applies only to unfinished fission nuclear power projects. If a certificate holder stops construction of a fission nuclear energy facility before completion, terminates the project or otherwise resolves not to complete construction, never introduces or stores fuel for the energy facility on the site, and never operates the energy facility as designed to produce energy, the certificate holder may contract, establish interlocal agreements, or use other formal means to effect the transfer of site restoration responsibilities, which may include economic development activities, to any political subdivision or subdivisions of the state composed of elected officials. The contracts, interlocal agreements, or other formal means of cooperation may include, but are not limited to provisions effecting the transfer or conveyance of interests in the site and energy facilities from the certificate holder to other political subdivisions of the state, including costs of maintenance and security, capital improvements, and demolition and salvage of the unused energy facilities and infrastructure.

  2. If a certificate holder transfers all or a portion of the site to a political subdivision or subdivisions of the state composed of elected officials and located in the same county as the site, the council shall amend the site certification agreement to release those portions of the site that it finds are no longer intended for the development of an energy facility.

Immediately upon release of all or a portion of the site pursuant to this section, all responsibilities for maintaining the public welfare for portions of the site transferred, including but not limited to health and safety, are transferred to the political subdivision or subdivisions of the state. For sites located on federal land, all responsibilities for maintaining the public welfare for all of the site, including but not limited to health and safety, must be transferred to the political subdivision or subdivisions of the state irrespective of whether all or a portion of the site is released.

  1. The legislature finds that for all or a portion of sites that have been transferred to a political subdivision or subdivisions of the state prior to September 1, 1999, ensuring water for site restoration including economic development, completed pursuant to this section can best be accomplished by a transfer of existing surface water rights, and that such a transfer is best accomplished administratively through procedures set forth in existing statutes and rules. However, if a transfer of water rights is not possible, the department of ecology shall, within six months of the transfer of the site or portion thereof pursuant to subsection (1) of this section, create a trust water right under chapter 90.42 RCW containing between ten and twenty cubic feet per second for the benefit of the appropriate political subdivision or subdivisions of the state. The trust water right shall be used in fulfilling site restoration responsibilities, including economic development. The trust water right shall be from existing valid water rights within the basin where the site is located.

  2. For purposes of this section, "political subdivision or subdivisions of the state" means a city, town, county, public utility district, port district, or joint operating agency.