The legislature finds that:
Demand for electricity in Washington state is projected to grow rapidly before the end of the decade due to several factors, including economic growth, transportation electrification, demand from data centers, and the shift to electric heating. Projections from the northwest power and conservation council and the western regional adequacy program show the potential for energy shortages in the near term.
The utilities and transportation commission has stated that "meeting the pace of growth anticipated in utility IRPs (integrated resource plans) will require annual resource additions equal to four to five times historic levels. The study finds the region experiencing significant headwinds due to permitting and interconnection delays, changes in federal policy, and higher costs. Without any new resource additions, the region would have a gap in resources beginning in 2026 and growing to 9 gigawatts by 2030, which is approximately the load of the state of Oregon."
Therefore, to provide the regulatory flexibility to meet Washington's growing demand for electricity, the legislature finds that power producers and utilities need additional tools to meet the growing demand for electricity in ways that balance Washington's goal of reducing CO2 emissions.
[Empty]
An electric utility or an affected market customer that fails to meet the standards established under RCW 19.405.030(1) and 19.405.040(1) must pay an administrative penalty to the state of Washington in the amount of one hundred dollars, times the following multipliers, for each megawatt-hour of electric generation used to meet load that is not electricity from a renewable resource or nonemitting electric generation:
1.5 for coal-fired resources;
0.84 for gas-fired peaking power plants; and
0.60 for gas-fired combined-cycle power plants.
Beginning in 2027, this penalty must be adjusted on a biennial basis according to the rate of change of the inflation indicator, gross domestic product implicit price deflator, as published by the bureau of economic analysis of the United States department of commerce or its successor. Beginning in 2040, the commission may by rule increase this penalty for investor-owned utilities if the commission determines that doing so will accelerate utilities' compliance with the standards established under this chapter and that doing so is in the public interest.
Consistent with the requirements of RCW 19.405.040(1)(b), a utility may opt to make a payment in the amount of the administrative penalty as an alternative compliance payment, without incurring a penalty for noncompliance.
[Empty]
Upon its own motion or at the request of an investor-owned utility, and after a hearing, the commission may issue an order relieving the utility of its administrative penalty obligation under subsection (1) of this section if it finds that:
After taking all reasonable measures, the investor-owned utility's compliance with this chapter is likely to result in conflicts with or compromises to its obligation to comply with the mandatory and enforceable reliability standards of the North American electric reliability corporation, violate prudent utility practice for assuring resource adequacy, or compromise the power quality or integrity of its system; or
The investor-owned utility is unable to comply with the standards established in RCW 19.405.030(1) or 19.405.040(1) due to reasons beyond the reasonable control of the investor-owned utility, as set forth in subsection (6) of this section.
If the commission issues an order pursuant to (a) of this subsection that relieves an investor-owned utility of its administrative penalty obligation under subsection (1) of this section, the commission may issue an order:
Temporarily exempting the investor-owned utility from the requirements of RCW 19.405.040(1) for an amount of time sufficient to allow the investor-owned utility to achieve full compliance with the standard;
Directing the investor-owned utility to file a progress report to the commission on achieving full compliance with the standard within six months after issuing the order, or within an amount of time determined to be reasonable by the commission; and
Directing the investor-owned utility to take specific actions to achieve full compliance with the requirements of this chapter.
An investor-owned utility may request an extension of a temporary exemption granted under this section. An investor-owned utility that requests an extension must request an update to the order issued by the commission under (b) of this subsection.
Subsection (3) of this section does not permanently relieve an investor-owned utility of its obligation to comply with the requirements of this chapter.
[Empty]
The governing body of a consumer-owned utility may authorize a temporary exemption from the standard established under RCW 19.405.040(1), for an amount of time sufficient to allow the consumer-owned utility to achieve full compliance with the standard, if the governing body finds that:
The consumer-owned utility's compliance with the standard is likely to: Result in conflicts with or compromises to its obligation to comply with the mandatory and enforceable reliability standards of the North American electric reliability corporation; violate prudent utility practice for assuring resource adequacy; or compromise the power quality or integrity of its system; or
The consumer-owned utility is unable to comply with the standard due to reasons beyond the reasonable control of the utility, as set forth in subsection (6) of this section; and
The consumer-owned utility has provided to the department a plan demonstrating how it plans to achieve full compliance with the standard, consistent with the findings of the report submitted to the legislature under RCW 19.405.080.
Upon request by the governing body of a consumer-owned utility, a consumer-owned utility must be relieved of its administrative penalty obligation under subsection (1) of this section if the auditor issues a finding that:
The governing body of the consumer-owned utility has properly issued a temporary exemption under (a) of this subsection for a period of time not to exceed six months; and
The governing body of the consumer-owned utility has submitted to the department a plan to take specific actions to achieve full compliance with the standard, consistent with the findings of the report submitted to the legislature under RCW 19.405.080.
Upon issuance of a finding by the auditor, the consumer-owned utility must submit a progress report to the department on achieving full compliance with the standard within the term authorized in the temporary exemption.
A consumer-owned utility may request an extension of a temporary exemption granted under this subsection, subject to the same requirements as provided in (a) through (c) of this subsection.
The attorney general may bring a civil action in the name of the state for any appropriate civil remedy including, but not limited to, injunctive relief, penalties, costs, and attorneys' fees, to enforce compliance with this chapter:
Upon the failure of the governing body of a consumer-owned utility to comply with the conditions of a temporary exemption found by the auditor to be properly adopted or extended; or
Upon failure of the governing body of a consumer-owned utility to comply with a finding by the auditor that a temporary exemption is not properly granted.
This subsection does not permanently relieve a consumer-owned utility of its obligation to comply with the requirements of this chapter.
To the extent an event or circumstance cannot be reasonably foreseen and ameliorated, such events or circumstances beyond the reasonable control of an electric utility may include but are not limited to:
Weather-related damage;
Natural disasters;
Mechanical or resource failure;
Failure of a third party to meet contractual obligations to the electric utility;
Actions of governmental authorities that adversely affect the generation, transmission, or distribution of nonemitting electric generation or renewable resources owned or under contract to an electric utility, including condemnation actions by municipal electric utilities, public utility districts, or irrigation districts that adversely affect an investor-owned utility's ability to meet the standard established in RCW 19.405.030(1) and 19.405.040(1);
Inability to acquire sufficient transmission to transmit electricity from nonemitting electric generation or renewable resources to load; and
Substantial limitations, restrictions, or prohibitions on nonemitting electric generation or renewable resources.
An electric utility must notify its retail electric customers in published form within three months of paying the administrative penalty established under subsection (1) of this section. An electric utility is not required to notify its retail electric customers when making a payment in the amount of the administrative penalty as an alternative compliance payment consistent with the requirements of RCW 19.405.040(1)(b).
Moneys collected under this section must be deposited into the low-income weatherization and structural rehabilitation assistance account created in RCW 70A.35.030.
For an investor-owned utility, the commission must determine compliance with the requirements of this chapter.
For consumer-owned utilities, the auditor is responsible for auditing compliance with this chapter and rules adopted under this chapter that apply to those utilities and the attorney general is responsible for enforcing that compliance.
[Empty]
If the report submitted under RCW 19.405.080 demonstrates adverse system reliability impacts from the implementation of RCW 19.405.040 and 19.405.050, the governor, consistent with the emergency powers under RCW 43.21G.040, may suspend or delay implementation of this chapter, or exempt an electric utility from paying the administrative penalty under this section, for a period of time sufficient to catalyze necessary investments in new electric generating resources and until system reliability impacts can be addressed. Adverse system reliability impacts may include, but are not limited to, the inability of electric utilities or transmission operators to meet reliability standards mandated by federal or state law and required by prudent utility practices.
[Empty]
(A) The northwest power and conservation council estimate for loss of load events for the region including Washington is greater than triple their threshold target of 0.1, and the peak magnitude exceeds their threshold target of 1,200 megawatts;
(B) A loss of load event greater than the northwest power and conservation council's thresholds for duration, or eight hours, and magnitude, or 1,200 megawatts, occurs in Washington; or
(C) In a resource plan or integrated resource plan filed and approved under chapter 19.280 RCW, an electric utility determines a greater than five percent loss of load probability without new resources within a four-year planning period.
ii. The department or the utilities and transportation commission is not required to find that a criterion specified in (b)(i)(A), (B), or (C) of this subsection is in place if the department or the utilities and transportation commission has clear and convincing evidence that the assumptions, calculations, or methodology used in determining those criteria were inaccurate and should not be the basis for the declaration of a resource adequacy crisis.
iii. In the event that the department or the utilities and transportation commission determines the existence of a resource adequacy crisis under (b)(i) of this subsection, an electric utility may designate an amount, in megawatt hours, and duration, of up to 30 years, for electricity generated from natural gas to meet reliability targets without being in violation of RCW 19.405.040(1) or 19.405.050(1).
Notwithstanding RCW 54.16.020, the fair market value compensation for an asset that is condemned by a municipal electric utility, public utility district, or irrigation district and that is either demonstrated in an electric utility's clean energy action plan or clean energy implementation plan to be used or acquired after May 7, 2019, to meet the requirements of RCW 19.405.040 and 19.405.050, or an asset that generates electricity from renewable resources or nonemitting electric generation, must include but not be limited to a replacement value approach. Additionally, the electric utility may seek, and the court may award, damages attributable to the severance, separation, replacement, or relocation of utility assets. The trier of fact may also consider other damages, as well as offsetting benefits, that it finds just and equitable.
An entity that establishes or extends service to the premises of a customer who is being served by an electric utility or was served by an electric utility prior to May 7, 2019, must serve those premises in a manner that complies with the requirements of chapter 288, Laws of 2019 and with chapter 19.285 RCW, if applicable. An electric utility or other entity that fails to comply with the requirements of this subsection must pay the administrative penalty under subsection (1) of this section for each megawatt-hour of electric generation used to serve load that does not meet the terms of this subsection.
It is the policy of the state that all retail sales of electricity to Washington retail electric customers be greenhouse gas neutral by January 1, 2030.
For the four-year compliance period beginning January 1, 2030, and for each multiyear compliance period thereafter through December 31, 2044, an electric utility must demonstrate its compliance with this standard using a combination of nonemitting electric generation and electricity from renewable resources, or alternative compliance options, as provided in this section. To achieve compliance with this standard, an electric utility must: (i) Pursue all cost-effective, reliable, and feasible conservation and efficiency resources to reduce or manage retail electric load, using the methodology established in RCW 19.285.040, if applicable; and (ii) use electricity from renewable resources and nonemitting electric generation in an amount equal to one hundred percent of the utility's retail electric loads over each multiyear compliance period. An electric utility must achieve compliance with this standard for the following compliance periods: January 1, 2030, through December 31, 2033; January 1, 2034, through December 31, 2037; January 1, 2038, through December 31, 2041; and January 1, 2042, through December 31, 2044.
Through December 31, 2044, an electric utility may satisfy up to twenty percent of its compliance obligation under (a) of this subsection with an alternative compliance option consistent with this section. An alternative compliance option may include any combination of the following:
Making an alternative compliance payment under RCW 19.405.090(2);
Using unbundled renewable energy credits, provided that there is no double counting of any nonpower attributes associated with renewable energy credits within Washington or programs in other jurisdictions, as follows:
(A) Unbundled renewable energy credits produced from eligible renewable resources, as defined under RCW 19.285.030, which may be used by the electric utility for compliance with RCW 19.285.040 and this section as provided under RCW 19.285.040(2)(e); and
(B) Unbundled renewable energy credits, other than those included in (b)(ii)(A) of this subsection, that represent electricity generated within the compliance period;
iii. Investing in energy transformation projects, including additional conservation and efficiency resources beyond what is otherwise required under this section, provided the projects meet the requirements of subsection (2) of this section and are not credited as resources used to meet the standard under (a) of this subsection; or
iv. Using electricity from an energy recovery facility using municipal solid waste as the principal fuel source, where the facility was constructed prior to 1992, and the facility is operated in compliance with federal laws and regulations and meets state air quality standards. An electric utility may only use electricity from such an energy recovery facility if the department and the department of ecology determine that electricity generation at the facility provides a net reduction in greenhouse gas emissions compared to any other available waste management best practice. The determination must be based on a life-cycle analysis comparing the energy recovery facility to other technologies available in the jurisdiction in which the facility is located for the waste management best practices of waste reduction, recycling, composting, and minimizing the use of a landfill.
c. Electricity from renewable resources used to meet the standard under (a) of this subsection must be verified by the retirement of renewable energy credits. Renewable energy credits must be tracked and retired in the tracking system selected by the department.
d. Hydroelectric generation used by an electric utility in meeting the standard under (a) of this subsection may not include new diversions, new impoundments, new bypass reaches, or expansion of existing reservoirs constructed after May 7, 2019, unless the diversions, bypass reaches, or reservoir expansions are necessary for the operation of a pumped storage facility that: (i) Does not conflict with existing state or federal fish recovery plans; and (ii) complies with all local, state, and federal laws and regulations.
e. Nothing in (d) of this subsection precludes an electric utility that owns and operates hydroelectric generating facilities, or the owner of a hydroelectric generating facility whose energy output is marketed by the Bonneville power administration, from making efficiency or other improvements to its hydroelectric generating facilities existing as of May 7, 2019, or from installing hydroelectric generation in pipes, culverts, irrigation canals, and other man-made waterways, as long as those changes do not create conflicts with existing state or federal fish recovery plans and comply with all local, state, and federal laws and regulations.
f. Nonemitting electric generation used to meet the standard under (a) of this subsection must be generated during the compliance period and must be verified by documentation that the electric utility owns the nonpower attributes of the electricity generated by the nonemitting electric generation resource.
g. Nothing in this section prohibits an electric utility from purchasing or exchanging power from the Bonneville power administration.
h. An electric utility is not in violation of the requirements of this subsection (1) as a result of using electricity generated consistent with a declared resource adequacy crisis under RCW 19.405.090(11)(b).
Investments in energy transformation projects used to satisfy an alternative compliance option provided under subsection (1)(b) of this section must use criteria developed by the department of ecology, in consultation with the department and the commission. For the purpose of crediting an energy transformation project toward the standard in subsection (1)(a) of this section, the department of ecology must establish a conversion factor of emissions reductions resulting from energy transformation projects to megawatt-hours of electricity from nonemitting electric generation that is consistent with the emission factors for unspecified electricity, or for energy transformation projects in the transportation sector, consistent with default emissions or conversion factors established by other jurisdictions for clean alternative fuels. Emissions reductions from energy transformation projects must be:
Real, specific, identifiable, and quantifiable;
Permanent: The department of ecology must look to other jurisdictions in setting this standard and make a reasonable determination on length of time;
Enforceable by the state of Washington;
Verifiable;
Not required by another statute, rule, or other legal requirement; and
Not reasonably assumed to occur absent investment, or if an investment has already been made, not reasonably assumed to occur absent additional funding in the near future.
Energy transformation projects must be associated with the consumption of energy in Washington and must not create a new use of fossil fuels that results in a net increase of fossil fuel usage.
The compliance eligibility of energy transformation projects may be scaled or prorated by an approved protocol in order to distinguish effects related to reductions in electricity usage from reductions in fossil fuel usage.
Any compliance obligation fulfilled through an investment in an energy transformation project is eligible for use only: (a) By the electric utility that makes the investment; (b) if the investment is made by the Bonneville power administration, by electric utilities that are preference customers of the Bonneville power administration; or (c) if the investment is made by a joint operating agency organized under chapter 43.52 RCW, by a member of the joint operating agency. An electric utility making an investment in partnership with another electric utility or entity may claim credit proportional to its share invested in the total project cost.
[Empty]
In meeting the standard under subsection (1) of this section, an electric utility must, consistent with the requirements of RCW 19.285.040, if applicable, pursue all cost-effective, reliable, and feasible conservation and efficiency resources, and demand response. In making new investments, an electric utility must, to the maximum extent feasible:
Achieve targets at the lowest reasonable cost, considering risk;
Consider acquisition of existing renewable resources; and
In the acquisition of new resources constructed after May 7, 2019, rely on renewable resources and energy storage, insofar as doing so is consistent with (a)(i) of this subsection.
Electric utilities subject to RCW 19.285.040 must demonstrate pursuit of all conservation and efficiency resources through compliance with the requirements in RCW 19.285.040.
An electric utility that fails to meet the requirements of this section must pay the administrative penalty established under RCW 19.405.090(1), except as otherwise provided in this chapter.
In complying with this section, an electric utility must, consistent with the requirements of RCW 19.280.030 and 19.405.140, ensure that all customers are benefiting from the transition to clean energy: Through the equitable distribution of energy and nonenergy benefits and reduction of burdens to vulnerable populations and highly impacted communities; long-term and short-term public health and environmental benefits and reduction of costs and risks; and energy security and resiliency.
Affected market customers must comply with the standard established under subsection (1) of this section.
A market customer that purchases electricity exclusively from carbon-free resources and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved, prior to May 7, 2019, by order of the commission is subject to the requirements of such an order and not to the standard established in this section. For purposes of interpreting any such special contract, chapter 19.285 RCW, as in effect on January 1, 2019, is not, either directly or indirectly, amended or supplemented.
To reduce costs for utility customers or avoid exceeding the cost impact limit in RCW 19.405.060(3)(a), a multistate electric utility with fewer than two hundred fifty thousand customers in Washington may apply the total amount of megawatt-hours of coal-fired resources eliminated from the utility's allocation of electricity before December 31, 2025, as an equivalent amount of megawatt-hours of nonemitting electric generation or electricity from renewable resources required to comply with subsection (1)(a) of this section. The utility must demonstrate that for every megawatt-hour of early action compliance credit there is a real, permanent reduction in greenhouse gas emissions in the western interconnection directly associated with that credit. A multistate electric utility must request to use early action compliance credit in its clean energy implementation plan that is submitted under RCW 19.405.060. The multistate electric utility must specify in its clean energy implementation plan the compliance years to which the early action compliance credit will apply, but in no event may the multistate electric utility use the early action compliance credits beyond 2035. The commission must establish conditions for use of early action compliance credits, including a determination of whether action constitutes early action, before the multistate electric utility's use of early action compliance credits in a clean energy implementation plan.
It is the policy of the state that nonemitting electric generation and electricity from renewable resources supply one hundred percent of all sales of electricity to Washington retail electric customers by January 1, 2045. By January 1, 2045, and each year thereafter, each electric utility must demonstrate its compliance with this standard using a combination of nonemitting electric generation and electricity from renewable resources.
Each electric utility must incorporate subsection (1) of this section into all relevant planning and resource acquisition practices including, but not limited to: Resource planning under chapter 19.280 RCW; the construction or acquisition of property, including electric generating facilities; and the provision of electricity service to retail electric customers. An electric utility is not in violation of the requirements of subsection (1) of this section by using electricity generated consistent with a declared resource adequacy crisis under RCW 19.405.090(11)(b).
In planning to meet projected demand consistent with the requirements of subsection (2) of this section and RCW 19.285.040, if applicable, an electric utility must pursue all cost-effective, reliable, and feasible conservation and efficiency resources, and demand response. In making new investments, an electric utility must, to the maximum extent feasible:
Achieve targets at the lowest reasonable cost, considering risk;
Consider acquisition of existing renewable resources; and
In the acquisition of new resources constructed after May 7, 2019, rely on renewable resources and energy storage, insofar as doing so is consistent with (a) of this subsection.
The commission, department, energy facility site evaluation council, department of ecology, and all other state agencies must incorporate this section into all relevant planning and utilize all programs authorized by statute to achieve subsection (1) of this section.
[Empty]
Hydroelectric generation used by an electric utility to satisfy the requirements of this section may not include new diversions, new impoundments, new bypass reaches, or expansion of existing reservoirs constructed after May 7, 2019, unless the diversions, bypass reaches, or reservoir expansions are necessary for the operation of a pumped storage facility that: (i) Does not conflict with existing state or federal fish recovery plans; and (ii) complies with all local, state, and federal laws and regulations.
Nothing in (a) of this subsection precludes an electric utility that owns and operates hydroelectric generating facilities, or the owner of a hydroelectric generating facility whose energy output is marketed by the Bonneville power administration, from making efficiency or other improvements to its hydroelectric generating facilities existing as of May 7, 2019, or from installing hydroelectric generation in pipes, culverts, irrigation canals, and other man-made waterways as long as those changes do not create conflicts with existing state or federal fish recovery plans and comply with all local, state, and federal laws and regulations.
Nothing in this section prohibits an electric utility from purchasing or exchanging power from the Bonneville power administration.
Affected market customers must comply with the obligations of this section.
Any market customer that purchases electricity exclusively from carbon-free resources and eligible renewable resources, as defined in RCW 19.285.030 as of January 1, 2019, pursuant to a special contract with an investor-owned utility approved, prior to May 7, 2019, by order of the commission is subject to the requirements of such an order and not to the standards established in this section. For the purposes of interpreting such a special contract, chapter 19.285 RCW, as in effect on January 1, 2019, is not, either directly or indirectly, amended or supplemented.
This act may be known and cited as the clean and reliable energy act.