Senate Bill 5243

Source

Section 1

This section adds a new section to an existing chapter 19.27. Here is the modified chapter for context.

Any building permit applications submitted with plans, computations or specifications prepared, stamped and signed by a professional engineer or architect, licensed under the laws of the state of Washington, in the specific discipline as appropriate, shall be deemed complete by the city or county building department with authority under RCW 19.27.050. The department may review the application for general compliance with the zoning or other land use control ordinances in effect and shall not impose substantial modifications or conditions on submittals prepared, stamped, and signed by a licensed architect, landscape architect, soils engineer, civil engineer, structural engineer, or combination thereof.

Section 2

This section modifies existing section 36.70B.030. Here is the modified chapter for context.

  1. Fundamental land use planning choices made in adopted comprehensive plans and development regulations shall serve as the foundation for project review. The review of a proposed project's consistency with applicable development regulations, or in the absence of applicable regulations the adopted comprehensive plan, under RCW 36.70B.040 shall incorporate the determinations under this section.

  2. During project review, a local government or any subsequent reviewing body shall determine whether the items listed in this subsection are defined in the development regulations applicable to the proposed project or, in the absence of applicable regulations the adopted comprehensive plan. At a minimum, such applicable regulations or plans shall be determinative of the:

    1. Type of land use permitted at the site, including uses that may be allowed under certain circumstances, such as planned unit developments and conditional and special uses, if the criteria for their approval have been satisfied;

    2. Density of residential development in urban growth areas; and

    3. Availability and adequacy of public facilities identified in the comprehensive plan, if the plan or development regulations provide for funding of these facilities as required by chapter 36.70A RCW.

  3. During project review, the local government or any subsequent reviewing body shall not reexamine alternatives to or hear appeals on the items identified in subsection (2) of this section, except for issues of code interpretation. As part of its project review process, a local government shall provide a procedure for obtaining a code interpretation as provided in RCW 36.70B.110.

  4. Pursuant to RCW 43.21C.240, a local government may determine that the requirements for environmental analysis and mitigation measures in development regulations and other applicable laws provide adequate mitigation for some or all of the project's specific adverse environmental impacts to which the requirements apply.

  5. Nothing in this section limits the authority of a permitting agency to approve, condition, or deny a project as provided in its development regulations adopted under chapter 36.70A RCW and in its policies adopted under RCW 43.21C.060. Project review shall be used to identify specific project design and conditions relating to the character of development, such as the details of site plans, curb cuts, drainage swales, transportation demand management, the payment of impact fees, or other measures to mitigate a proposal's probable adverse environmental impacts, if applicable.

  6. Subsections (1) through (4) of this section apply only to local governments planning under RCW 36.70A.040.

  7. Any building permit applications submitted with plans, computations or specifications prepared, stamped and signed by a professional engineer or architect, licensed under the laws of the state of Washington, in the specific discipline as appropriate, shall be deemed complete by the city or county building department with authority under RCW 19.27.050. The department may review the application for general compliance with the zoning or other land use control ordinances in effect and shall not impose substantial modifications or conditions on submittals prepared, stamped, and signed by a licensed architect, landscape architect, soils engineer, civil engineer, structural engineer, or combination thereof.


Created by @tannewt. Contribute on GitHub.